Ejection Testing
This page covers the standard procedure and safety protocols of ground ejection separation testing for high power rockets. Ground testing must be performed before all launches that utilize any form of electronic deployment.
Why do we ejection test?
Ejection testing is necessary to verify proper rocket separation and chute deployment during recovery.
Calculate BP Charges
There are various
Procedure
Assembly
Testing
Field Recovery Box Contents * Portable fire extinguisher * Flame retardant gloves * Ejection test controller
- Prepare the recovery system as it would be for flight.
- Use appropriate safety precautions and PPE.
- Arm the ejection system in a safe environment.
- Trigger the ejection charge remotely.
- Observe deployment and document results.
- Adjust charge size or configuration as needed.
Safety Notes
- Always conduct tests outdoors in a controlled area.
- Keep all personnel at a safe distance.
- Have fire suppression equipment available.
Created by Aidan M. Last edited by Aidan M. on 2026-01-31